C2000R Tea bag packaging

Machine overview

Only original parts assure original performance.

IMA provides customers with a highly qualified service centre which performs overhaul and maintenance on a selection of  teabag packaging machines in order to provide a solution for companies in search of high-performance equipment at competitive prices.
Overhaul is carried out by Revisioni Industriali, an IMA-managed company, using exclusively original parts. This ensures full compatibility and integration with each machine and guarantees the same performance levels as for new equipment. Moreover, Revisioni Industriali is the only company able to replace old machine parts and groups with new and updated ones by availing themselves of technical improvements developed by IMA.
Customers can choose between a full overhaul and a partial revision, deciding on whether they require an immediate replacement or await revision of the existing machine.
An entire overhaul carried out on our premises takes up to 3-4 months.
partial revision on our premises takes between 2 and 3 months. When carried out directly at the customer’s premises by skilled technicians, this option avoids shipping costs and minimises production losses.
A third option enables customers to purchase a fully overhauled machine in exchange for their old one with a buy-back agreement. This ensures minimal production loss.

Production plant

IMA R.I.

Machine highlights


  1. 1

    An entire overhaul carried out on our premises takes up to 3-4 months.


  2. 2

    A partial revision on our premises takes between 2 and 3 months. When carried out directly at the customer’s premises by skilled technicians, this option avoids shipping costs and minimises production losses.

C2000 Overhauling procedure

• Complete disassembly and washing of all machine parts
mechanical parts control, external heat-treatment, re-painting of the parts assembly of the machine and replacement of any worn parts with original IMA spares.
• Updating of the machine on the basis of IMA’s latest technological developments installation of a new updated electrical panel, re-wiring including hardware and software upgrade.
• Electrical system overhaul and installation of the new electrical panel including all recent devices applied by IMA to new machines.
• Final testing of the machine using packaging materials supplied by the end customer.

Technical information

TECHNICAL DATA C2000 OVERHAULED
Machine speed (Bags/minute)Up to 450
Tea bag capacityUp to aproximately 4.0 grams
Filter bag maximum volume14.3 cubic centimeters
Power requiredTotal installed power: 18 kW
N.b. Power consumption depends on the thermic groups fitted in the machine
Compressed air (without outer envelope)

Exercise pressure: 6 bar
Consumption: up to max 500 Nl/min.
Air supply connection: 1/2 b.p.s.

Compressed air (with outer envelope)

Exercise pressure: 6 bar
Consumption: up to max 400 Nl/min.
Air supply connection: 1/2 b.p.s.

Machine net weightMax. 6,300 Kg

Keep browsing IMA solutions