Nebula Aseptic Processing
Machine overview
Hyperspeed decontamination technology.
Responding to the GMP Annex 1 notes, whereby risks linked to sterility assurance must be minimised during material transfer and supported by high-capability transfer technology, NEBULA accomplishes what no other solution has done before.
Adopting an unprecedented approach to ensuring 100% sterility of RTU material as it enters and transits isolated production lines, NEBULA is a high-speed decontamination tunnel which integrates seamlessly with IMA LIFE aseptic fill-finish lines.
6-log decontamination is achieved over the entire external packaging surface using aerodynamic containment of highly concentrated vapour phase hydrogen peroxide (HC-VPHP), while material crosses the tunnel in a matter of seconds.
This allows for continuous, high-speed tub introduction, up to six per minute.
Production plant
IMA Life
Machine highlights
-
100% sterility
High-speed transfer technology ensuring 100% sterility of Ready-To-Use material as it enters the isolator.
-
6-log decontamination
6-log decontamination achieved over the entire external packaging surface.
-
Operating safety
Maximum safety for both operator and cleanroom by chamber pressure management, avoiding any hydrogen peroxide circulation within the isolator and outside NEBULA.
-
Continuous processing
Continuous, high-speed RTU introduction, up to six tubs/trays per minute: alternative solution to eBeam, pulsed light and NO2 technologies.
-
Seamless integration
Easy connection to aseptic fill-finish plants to enhance their performance.
-
Sterility assurance
Excellent sterility assurance according to Annex 1 guidelines.
-
Layout friendly
Minimal impact on layout.
-
Size changeover
Easy size and RTU size changeover: independent of packaging.
Maximum safety
The tunnel is comprised of a series of chambers in which pressure is managed to ensure maximum safety for both operator and cleanroom, avoiding hydrogen peroxide circulation within the isolator.
Machine details
Technical information
| NEBULA TECHNICAL DATA | |
| Features | Dimensions |
| Decontamination tunnel dimensions (cleanroom) | 3.7 m (L) x 0.9 m (W) x 1.5 (H) + inlet/outlet piping up to the ceiling |
| Power supply & ventilation skid dimensions (technical area) | 2.3 m (L) x 1.2 m (W) x 2.8 m (H) |
| AHU dimensions (technical area) | 2.0 m (L) x 0.8 (W) x 2 m (H) |
| Cabinet H₂O₂ solutions (cleanroom/technical area) | 1.2 m (L) x 0.5 m (W) x 1.6 m (H) |
| Ready-To-Use tub/trays | 3-4” tubs (standard Nebula), 6” tubs, vial trays (to be requested) |
| Outlet H₂O₂ catalyser | included |
| Output | Up to 6 RTU/min (max speed @ 30sec 6-log decontamination time) |
| Expected 35% H₂O₂ solution consumption in production | 6 l/hr |
| H₂O₂ storage | 2x20L tank – 35% aqueous hydrogen peroxide solution high purity – low residues |
| Requested utilities | Ventilation inlet airflow: 450 m3/h from technical area |

Promo video
Enhancing the performance of advanced robotics, the INJECTA 36 raises the bar for high-speed production of Ready-To-Use components.





